Roof Demolition Notes

Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
Roof demolition notes. 12 13 14 interior finishes shall be class c surface flame spread rating of 76 200. See structural drawings for top of steel t o s at all proposed roofs. You ve got endless choices exceptionally so you want to make sure you hire the right team. Contractor shall field verify all existing conditions including the locations of structural mechanical electrical piping and conduit prior to proceeding with the demolition work.
Two demolition workers die of burns after flash fire at warehouse. The contractor shall be responsible for any damage caused during the performance of their contracted work. Roof plan general notes a the replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety. Where existing finish surface is to remain repair patch all locations associated with demolition removal of adjacent finishes framing fasteners etc.
You can rest easy knowing that we do exceptional. However the hazards of demolition work can be controlled and eliminated with the proper planning the right personal protective equipment necessary training and compliance with osha standards. Information contained here is a result of limited field verification. At the demolition of an existing item remove all traces of the demolished items components from the surface of the remaining floor walls ceiling and roof.
General demolition notes 1. Existing roof drain systems are to remain fully operational functional during the re roofing and design build contractor is responsible for providing temporary protection during demolition and renovation activities. Existing roof drains are to be cleaned and maintained free of debris during re roofing. 949 768 7048 owner operated provides you with reliable roofing tear down demolition and professional work.
At the removed fasteners in all existing masonry walls and floors patch hole with grout level with existing adjacent substrates in order to receive new finishes. General notes new construction on sheet a200 102. The demolition drawings have been developed from. The peak of reliable roof demolition company.
The roof is to perform under category 5. General notes roof plan 1. No trench overcuts allowed at finished slab areas. General notes for demolition plan 101.